Developer/Contractor must give Granger-Hunter Improvement District (The District) a minimum of 24 hour's notice prior to all inspections. When scheduling inspections please note the following:
The District’s inspections hours are from 8:00 AM - 4:00 PM Monday-Thursday, excluding all holidays, based on availability. Please give the District representative a 30-minute window frame for arrive.
Inspections must be scheduled by calling the District’s office at 801.968.3551. No inspections will be scheduled from voice mail messages. If necessary please leave a message to call you back.
Contractor must be present during inspection.
c. Additional inspections fees may be assessed if a District representative is dispatched, and the job is not inspection ready. We do require a 24-hour cancellation notice. Please give as much notice as possible for rescheduling.
All work completed that has not been inspected will be required to be uncovered and inspected prior to any final acceptance given for the project. Please not that:
Projects that have not been given a final acceptance letter will not be allowed to connect to the District’s water and sewer Utilities, and/or,
Projects that are connected to the District’s Utilities will be considered to be in default, and the connection will be terminated until final acceptance is given.
In the event a stop work order is issued, the Developer/Contractor shall stop work and comply with all requirements set forth by the District’s inspectors.
Lateral repair inspections, call our office for permit.
NOTE: It is the contractor’s sole responsibility to comply with all State of Utah, Salt Lake County, West Valley City, and Granger-Hunter Improvement District requirements and specifications.
Granger-Hunter Improvement District is fully committed to providing accessible facilities, elements and
channels of communication to all members of the public. As part of this commitment, Granger-Hunter Improvement District
has a policy of providing an accessible website compatible with the Web Content Accessibility Guidelines (WCAG 2.1) and
commercial screen reading software. All features of the website are coded to allow individuals with vision and
other impairments to understand and use the website to the same degree as someone without disabilities. We welcome
feedback and can often resolve issues in a timely manner if they arise.
If you need any special assistance or accommodations:
Granger-Hunter Improvement District has designated a compliance officer for website disability-related accommodations.
The compliance officer has received training in website accessibility and updates the site in accordance with those best
practices. Contact our accessibility officer to report an issue.
Compliance Procedures and Reports
In addition to testing with users with a wide range of disabilities and coding our website to WCAG standards,
Granger-Hunter Improvement District regularly scans its website to ensure ongoing compliance, and makes timely
changes to any inaccessible changes, if any are found.
Linked Documents and Third Parties
Please note that this site may link out to third-party websites, such as state or federal agencies, that do
not have accessible content. This site may also include documents provided by third parties included in our
agenda packets, for example. While we cannot control the accessibility of content provided by third parties,
we are happy to assist any member of the public with reading and accessing content on our site.