18B: 4100 South Waterline Replacement - Bangerter Highway to 5600 West
Consultant (Design): Horrocks Engineers (WVC/UDOT - Local Governments Project)
Consultant (CM): PEC (Project Engineering Consultants)
Contractor: Geneva Rock Products, Inc.
Status: The Contractor is beginning to install the loops on the 16 and 20-inch transmission line in preparation for storm drain laterals to be installed. This work will take place in the middle of the road over the winter.
*This Project is partially funded by a Drinking Water State Revolving Fund Program through the Environmental Protection Agency and the Utah Department of Environmental Quality. Visit www.epa.gov/dwsrf for more information.